We’re having new office space built out and we’ll be moving at the end of the month (hopefully). I’m learning a lot about this process as we go through it. Here are some of the inspections/permits that we’ve had to get:
- ceiling electrical
- ceiling mechanical
- ceiling final
- wall electrical
- wall mechanical
- wall final
- low voltage
- sprinkler
- hydro
- fire alarm
- plumbing
- building final
I’m sure there more than that – those are just the ones I’ve had to deal with.